Capability
Dresses, tops, outerwear, trousers
Full package
What we make, and our terms.
Our minimums, lead times and terms, from first sample to delivery, so you can decide if we’re a fit before you call.
Minimums and lead times
Stock or printed fabric
100
pieces per style, per colour
Dyed to your colour
250+
because the dyehouse’s minimum batch is 500–1,500 m
Tech pack to sample
2 weeks
including our pattern
Approval to bulk
1 month
from your written approval
- Print runs
- A print run is at least 150–200 m of fabric. Prints are often the cheapest way to start with a small first order.
- Sample fee
- CNY 500–1,000 per style, depending on complexity. Credited against orders of 200 pieces or more.
- Repeats
- A repeat of an approved style skips sampling and goes straight into the 1-month bulk window.
Categories
- Dresses
- Mini, midi, maxi. Printed, plain, chiffon, satin, jersey. Corsetry, structured bodices and linings. Dresses are most of what we make.
- Tops
- Blouses, camisoles, bodysuits, knitwear.
- Outerwear
- Unlined and lined jackets, lightweight coats.
- Trousers
- Tailored and relaxed trousers. Skirts, co-ords and matching sets.
- What we don’t make
- Genuine leather and silk. If your range needs them, we’ll tell you in our first reply.
The sample room
It’s our own. We make and grade patterns on CAD, then cut and fit the sample here.
- You have a tech pack
- Send it. We make the pattern from it and tell you if anything won’t sew the way it’s drawn.
- You have sketches
- We develop the pattern with you. We help with the technical side; the designs stay yours.
- Fabric
- We can recommend and source. Tell us the feel and weight you want and we’ll send options before you commit.
- Grading
- In house. Send your size set and tolerances.
Fabric and trims
- How we normally work
- Full package: we buy the fabric and trims, and you buy finished garments, so you don’t carry fabric risk.
- If you supply
- Send it and we’ll cut and sew it (CMT). Tell us when you ask for a quote, because it changes the unit price and lead time.
- Dye lots
- A plain colour needs 500–1,500 m of fabric per colour, depending on the base fabric. That’s the mill’s minimum.
Payment, currency and freight
- Payment
- 30% deposit, 70% before shipment.
- Currency
- AUD, NZD, GBP, USD or CNY.
- Freight
- We usually quote FOB and can quote other terms.
- Inspection
- A shipment sample goes to you before goods leave. If you want a third-party inspection, raise it when you order.
Start with one style
If our minimums suit your range, send us a tech pack.
Get a costingNo tech pack yet? Ask a question.
James replies in English within one business day; the costing follows in 2–3 days.